View Issue Details

IDProjectCategoryView StatusLast Update
0000891K18X001.00 SKB SWANHWpublic2020-12-10 14:25
Reporter(ALTech) SH Son Assigned To(PM) Henry ChiouDue Date
PrioritynormalSeveritys2-severeReproducibilityhave not tried
Status closedResolutionfixed 
Summary0000891: [SWAN] sub meterials request for mock up assembly
Description[8/28_ALT] for Mockup assembly, need to below meterials
 - external power switch 20pcs.
 - all of wire harness 20pcs below
 . 8pin cable from main board to LED board
 . 8pin cable from LED board to left side and right side LED board
 . FPC cable from main board to AMP board
 . 10pin cable from main board to Button key board
 . 10pin cable from main board to Mic linear board
 . 2 pin cable from main board to AMP board
 . BT ANT assembly
-> Make all cables 150% longer than your estimation. because We have to make cable routing to avoid the mechanical structure

FXN estimation cable routing
https://mantis.cnsbg.foxconn.com/vaas/view.php?id=847#c3989
TagsNo tags attached.
Attach Tags

Relationships

related to 0000945 closed(PM) Henry Chiou [SWAN] Mockup assembly guide 

Users monitoring this issue

Activities

(ALTech) SH Son

2020-08-28 12:46

developer   ~0004158

HI henry,

Please check this request.
ALT&Inkel will have to review the cable routing using mockup in Korea

Please send the these cable

Thanks
SON

(PM) Henry Chiou

2020-09-09 08:57

developer   ~0004268

Hi SH

Below tracking FYI
1. BT antenna(20pcs): FEDEX#921141430466
2. Board to board wire harness (30sets except the switch cable*29pcs): SF1095171208158
3. FFC cable: ETD TW 9/18 but the PCBAs provided will go with normal length cables

Best,
Henry

(ALTech) SH Son

2020-12-10 14:25

developer   ~0005408

this item was received.

Thanks Henry.

Issue History

Date Modified Username Field Change
2020-08-28 12:43 (ALTech) SH Son New Issue
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (ALTech) SB Park
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (HW) Sean Chiang
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (HW) Tom Lee
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (ME) Daniel Hu
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (PM) Henry Chiou
2020-08-28 12:44 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2020-08-28 12:44 (ALTech) SH Son Assigned To => (PM) Henry Chiou
2020-08-28 12:44 (ALTech) SH Son Status new => assigned
2020-08-28 12:46 (ALTech) SH Son Note Added: 0004158
2020-09-09 08:57 (PM) Henry Chiou Note Added: 0004268
2020-09-23 11:09 (ALTech) SH Son Relationship added related to 0000945
2020-11-13 11:20 (SW) Jacky Chiang Project T99X171.00 SKB Eagle => K18X001.00 SKB SWAN
2020-12-10 14:25 (ALTech) SH Son Status assigned => closed
2020-12-10 14:25 (ALTech) SH Son Resolution open => fixed
2020-12-10 14:25 (ALTech) SH Son Note Added: 0005408